Product Design and UX articles.

Discover how to make brand strategy, visual identity, and UX work together for digital platforms. A designer's guide to creating impactful experiences.

Learn how brand and UX synergy boosts user experience. Expert designer insights on aligning visual identity with usability for better engagement and results.

Teams rush to ship features, celebrate the launch, and then wonder why the product doesn't stick. The truth?

In this post I’m going to focus on Cognition Patterns as the psychology behind users'' behavior.

We often tend to copy and paste solutions from different sources, but it won't work for us in case if we don't understand why we copy these solutions and how they will work.

Sometimes it makes sense to go deep in details of design that we are doing. Because design nowadays is more how it feels whether how it looks. And small minor things matters a lot.

Color can play a great role in any type of design. Sometimes we can use similar types of design, but with different color palettes. And we can experience very different feelings regarding them.

Hamburgers, sandwiches, menus, snack bars… Wait a minute.

Over 90% of creatives hate this part of the creative freelance business.

I decided to figure out what has changed on the market. What is the most required service and how has the current state of things impacted this business model?

Using well-known design patterns makes it harder to make design mistakes and create a bad user experience.

The most popular form design patterns and ways of implementing them well in your product and business.

User Journeys and ways of improving your design process using this approach.

101 of prototyping.

I want to explain the Product designer title and how it is different from other designers.

Our eyes are not used to so much screen time. Especially late in the evening. The dark mode is a solution, and it's better to have it to cover all the use cases people might have.

Covering the topic of different aspects that app design price is based upon.

The future of product design with the application of design systems.

In this article, you can find read about all the navigation elements, patterns, pros and cons, study notes, etc.

My summary and research notes on interfaces we see in Sci-fi movies and how partially it's our future.

It's not always about the navigation.

Fundamental rules of forms design that actually improve user experience.

Sharing my process of creating a landing page from scratch.

Smart people say that we need to focus only on one thing. It sounds good in theory, but it's hard to implement this in everyday creative life.

There is no single and true process for generating a killer idea. What works for one creative probably will not work for another one - the same for projects.

Doing user research is like eating healthy food, exercising, and getting an annual checkup. Almost everyone thinks that it's good to do these things, but many fail to do them.

Perfection is like chasing the horizon. Keep moving.

I've done a small research about some prominent UX Design Examples and wrote about how they changed our world.

Usually, people can be skeptical about this part of the design, but at the same time, it makes the design much more very efficient.

I want to share the results of my research and practical thoughts about the right way of aligning text in design elements.

A comprehensive list of skills would be great to gain as soon as possible.

The user experience should always be the end goal of every design process. And it doesn't matter what tools do we use.

Should it be the main screen of your product or just a list of content? What information is appropriate for a starting point?

We no longer can ignore mobile and tablet screens or desktops (the other way around) if we design an interface.

A river cuts through a rock not because of its power but its persistence.

In this post, I want to talk about how we can create a design that will work for both platforms.

Some design tweaks can make a noticeable difference to your revenue.

Provide users with a means for getting from one point to another on the site.

Colors have a strong impact on design solutions that we produce.

We can work with time or we can work against the time.

Sometimes we don't understand a real value of a solution.

Sometimes, it's really hard to create when you have an unlimited amount of choices.

Sometimes, it's hard to understand what's going on with your business and why some things do not work.

The most common facts about UX design to give you a basic understanding of what it is and why we need it

The internet even these days mostly consists of about 80% of text information. So it totally makes sense to pay attention to it.

I've been researching some best designs of landing pages and wrote some notes on the most important parameters that make it efficient.

Whether in 2D or 3D design, shapes and forms greatly affect our subconscious and are used to great effect by designers in order to convey the right messages.

At least, a big percentage of disappointed customers can leave you and never come back. This is the most painful fact for businesses that actually care about their customers, sales, and funnel in general.

Why does one design works and another doesn't?